Commercial Roofing in Chandler

Does the City of Chandler require an ASTM E1918 reflectivity test for re-roofing?

Yes. Chandler enforces the 2018 AECC Section C402.3 - minimum 0.65 initial solar reflectance per ASTM E1918 for low-slope commercial buildings above 2,000 sq ft. We include the reflectivity test in every Chandler commercial re-roofing closeout package as a standard deliverable.

How the roof work moves.

Document

Confirm access, roof system, visible failure points, drainage, penetrations, edge metal, interior leak locations, and safety constraints.

Scope

Separate immediate repair work from coating, recover, replacement, maintenance, warranty, or capital planning recommendations.

Execute

Coordinate materials, crew timing, tenant impact, weather windows, closeout photos, and the records the owner needs after work is complete.